Tee Bar Font Kits

KegLand Undercover / Build In / Semi-Integrated Kegerator | Tee Bar Font Kits

Tee Bar Fonts

  1. Remove the caps from the end of the fonts and ensure the font collar is present at the base of the font prior to attaching any duotight compatible short shanks

  2. NOTE: Install shanks from the middle of the font outwards

  3. Feed the length of 4mmx8mm EVABarrier beer line through the tap hole on the front of the font and feed the 4mmx8mm EVABarrier beer line through the slimline nut and convex collet on the inside of the font. For a guide to getting the correct length for beer line refer to Balancing Lines & CO2 Pressure

  4. Push a 6.5mm x 8mm reducer onto the back of the duotight compatible short shank. NOTE: duotight collets are colour coded to represent the appropriate EVABarrier tubing diameter. 6.35mm collets are green, 8mm are black and 9.5mm are blue

    Attach duotight reducer to short shank
  5. Feed the tail and thread of the duotight compatible short shank through the tap hole and align the curvature of the shank and the concave collet with the curvature of the font. Angling the shank off to the side slightly is generally easiest

  6. Push each length of beer line into the 6.5mm x 8mm reducer which is attached to a short shank

  7. Tighten the slimline nut onto the thread of the duotight compatible short shank to secure the shank to the font tower.

  8. Repeat for all other duotight compatible short shanks and beer lines

  9. Feed the beer lines from the duotight compatible short shanks into the kegerator

  10. Using the included M5 x 30mm bolts, mount the font onto the kegerator after feeding the lines through into the kegerator

  11. Attach each EVABarrier beer line to a liquid ball lock disconnect or keg coupler

  12. Hand-tighten the tap (sold separately) onto the duotight compatible short shank

  13. Tighten the short shank collar onto the tap using a 7 in 1 tap wrench/spanner

    Tightening Short Shank with 7 in 1 tool

EVABarrier Gas Line Setup (Four Tap Tee Bar Font Kits)

  1. Double check that the the 5mm x 8mm EVABarrier gas line is securely connected to the MK4 or MK5 regulator

  2. Feed this through the gas inlet into the kegerator.

  3. Cut an approximately 2m length of 5mm x 8mm EVABarrier gas line from the end

  4. Cut this section into approx 4 x 50cm lengths

  5. Push each length into the 8mm duotight Equal Tee Pieces

    Quadruple Gas Line Configuration
  6. Connect the other end of the EVABarrier to the duotight fitting on the coupler or a Ball Lock Disconnect. The fitting will depend on the kegerator setup - whether it is for commercial (brewery made) beer or for homebrew

  7. Insert the remaining length of 5mm x 8mm EVABarrier (that is connected to the regulator) into the the Equal Tees

Last updated