Preparation & Installation
KegLand Undercover / Build In / Semi-Integrated Kegerator | Installation
Last updated
KegLand Undercover / Build In / Semi-Integrated Kegerator | Installation
Last updated
If kegerator has been moved/delivered do not turn it on unless it has been standing upright for at least 24 hours. Failure to do this will void warranty and may damage the kegerator. Leave the kegerator upright for at least 24 hours before plugging in mains power after receiving and unboxing
CO2 gas can be dangerous. Make sure to always use CO2 in a well ventilated space
Never exceed 40psi in your keg system
Always flush chemicals from the beer line completely before tapping keg
Always check for gas leaks once the kegerator is set up
MK4 CO2 Type 30 Regulator
Black Reinforced Plastic Drip Tray
Font Plug
Swappable Door Hinges
Custom Adhesive Door Handle (Place the door handle either horizontal on top of the door, or vertical. The choice is yours for which aesthetic is most pleasing)
Climate Class: T (Tropical)
Refrigerant: R600a
Gas Amount: 25g
Rated Current: 1A
Power: 106 Watts
Fridge Capacity: 170L
Voltage: AC220V
Hz: 50Hz
Width - 600mm Height - 865mm (no castors) Depth - 600mm (640mm including handle and rear fittings) Download the drawings of this model here.
Designed to fit in a standard 600mm wide cavity
For a detailed guide on installing the UnderCover Kegerator into your cabinetry/indor or outdoor bar setup, please refer to this video:
Please note as that as this unit is designed to be built in it does not include castor wheels, a guard rail or CO2 cylinder bracket.