All pages
Powered by GitBook
1 of 1

Loading...

KL51361 - Automatic Keg Washing & Filling Machine

It enables simultaneous washing and filling operations. Equipped with pressure sensors and liquid level detection systems, the machine features independent sanitary grade stainless steel piping and medium storage tanks (with manhole, overflow port and drain outlet). Controlled by a Siemens PLC touch screen interface, it allows flexible configuration of process parameters according to actual production requirements.

Product Features

  • Multi‑step professional washing procedures

  • Multiple keg parameter configurations can be stored

  • Automated temperature‑pressure control and custom parameter setting

  • Simultaneous washing and filling

  • IFM automatic metering filling system

  • Food‑grade disinfectant / hot‑water sterilization for each keg neck before and after filling

  • Easy installation, plug‑and‑play, low maintenance cost

  • Three‑year warranty for JKM/JFE branded sensors

Keg washing is performed in an inverted orientation. The keg spear points downward and connects to the washing head.

During the washing cycle, the Y‑type presser and keg platform descend to couple the keg spear with the washing head and open the keg spear port. Each media inlet and media valve introduce cleaning agents into the washing head for recirculating cleaning inside the keg.

Upon completion of the washing phase, the Y‑type presser and keg platform rise, and the washing process is finished.

The cleaned keg is placed at the filling station for inverted filling. The keg spear points downward and connects to the filling head.

During the filling cycle, the Y‑type presser and keg platform descend to couple the keg spear with the filling head. Before opening the keg spear port, the spear neck is sanitized with hot water / disinfectant, followed by CO₂ purging. The keg spear port is then opened, and CO₂ pre‑pressurization is carried out prior to metered filling. Once filling is completed, the keg port is closed. The spear neck is sanitized again with hot water / disinfectant and blow‑dried with CO₂.Filling process finished.

JKM proprietary brand valve manifold, dead zone free sealing connections between valves.

Three‑year warranty for JKM/JFE branded sensors

Flowmeter Upgrade

JKM has established in‑depth cooperation with E+H. Tailored to the characteristics of craft keg lines and miniaturized application scenarios, the PICOMAG compact flowmeter is custom‑integrated. This design greatly optimizes the equipment space layout, and delivers high‑precision flow monitoring and real‑time closed‑loop control for filling products. It significantly improves the repeatability of technological processes and consistency of filling results, and meets stringent hygiene and quality requirements for production.

Dimensions

1550×1200×2200 mm

Weight

380 kg

Capacity

Approx. 30‑50 kegs/hour

Total Power

9 kW

No.

Media Name

Connection Type

Site Supply Pressure

1

Compressed Air

Φ12 air tube

6‑8 bar

Step

Washing Sequence

7L Sec

10L Sec

20L Sec

30L Sec

Remarks

Step

Filling Sequence

20L Sec

Remarks

1

Product Features

Media Port

At the Washing Station

At the Filling Station

Advantages

Media Tank

2 pcs / 120 L

Heating Method

Electric heating / 6 kW

Water Pump

SUS304 / 1.1 kW × 2

Valves

Automatic valves

Applicable Keg Types

7‑60 L Euro‑standard / US‑standard

Keg Spear

Custom‑made per customer requirement

PLC

SIEMENS S7‑S200 Smart

HMI

SIEMENS Smart 700

2

Steam

DN20

5‑6 bar

3

Sterile COâ‚‚

Φ12 air tube

2‑3 bar

4

Beer Supply / CIP Inlet

Φ25 quick‑connect, clamp size 50.5 mm

2‑3 bar

5

Pure Water

Φ25 quick‑connect, clamp size 50.5 mm

2‑3 bar

6

CIP Return Port

Φ25 quick‑connect, clamp size 50.5 mm

2‑3 bar

7

Drain

Φ25 quick‑connect, clamp size 50.5 mm

2‑3 bar

8

Vent

Φ25 quick‑connect, clamp size 50.5 mm

2‑3 bar

1

Residual‑Beer Drainage

2

3

4

5

Free configurable

2

2

2

2

2

Fresh‑Water Flushing

10

11

12

14

Free configurable

2

2

2

2

3

Fresh‑Water Drainage

8

10

10

10

Free configurable

2

2

2

2

4

Alkali Washing

20

25

30

35

Free configurable

2

2

2

2

5

Alkali Recovery

10

12

15

15

Free configurable

2

2

2

2

6

Washing Flushing

10

11

12

14

Free configurable

2

2

2

2

7

Washing Drainage

8

10

10

10

Free configurable

2

2

2

2

8

Washing Flushing

12

15

20

20

Free configurable

2

2

2

2

9

Washing Drainage

10

10

10

10

Free configurable

2

2

2

2

10<2>

Steam Purging

4

5

6

6

Free configurable

2

2

2

2

11<2>

Steam Pre‑pressurization

5

5

5

5

Default 5s

2

2

2

2

12<2>

Steam Pressure Holding

20

20

20

20

Free configurable

2

2

2

2

13

COâ‚‚ Purging

5

5

5

5

Free configurable

2

2

2

2

14

CO₂ Pre‑pressurization

5

5

5

6

Free configurable

‑

Total

153

171

189

199

‑

Hot‑water flushing of keg spear neck

4

Free configurable

2

2

Steam sterilization of keg spear neck

4

Free configurable

Optional step upon customer request

2

3

COâ‚‚ Purging

5

Free configurable

2

4

CO₂ Pre‑pressurization

AUTO

Free configurable

2

5

Filling

Free configurable

2

6

Hot‑water flushing of keg spear neck

4

Free configurable

2

7

Steam sterilization of keg spear neck

4

Free configurable

Optional step upon customer request

2

8

CO₂ blow‑dry of keg spear neck

5

Free configurable

2

9

Filling Completed